Watts Premier WP5-50 Troubleshooting Guide Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Page 10
Thread the plastic elbow (supplied in the parts bag) onto the stainless
steel connection on the top of tank. Tighten using an adjustable
wrench. Do not over tighten as plastic could crack.
Step 17
Step 18
Wrap (7 to 12 turns) of Teon tape clockwise around the male pipe
threads (MPT) on the Stainless Steel tting on top of the tank.
Tank Elbow Installation
Do not let the tape cover the opening.
Note:
Connect Blue Tube from “TANK” Port on RO Module to the Tank
Position tank in desired location. Stand it upright or lay it on its side (using the black plastic
stand). Measure the blue tube from the RO module port marked “TANK” over to the tank
and cut it to desired length.
Insert the blue 3/8” tube into the compression side of the elbow previously installed on top of
the storage tank and push in as far as it will go. Tighten the compression nut securely with a
wrench.
Step 19
Step 20
Step 21
Connect the Red Tube from Faucet to RO Module
Insert the open end of the red 1/4” tube attached to the RO faucet
into the 1/4” X 1/4” quick connect tting on the RO Manifold. Make
sure the tube is pushed in all the way to the tube stop. (See Picture)
Connect red faucet tube.
Green Tube Connection
Step 16
Locate green tube attached to the RO Module. Insert the open
end of the green 1/4” tube into the open 1/4” quick connect tting
on the plastic water feed valve making sure the tube is pushed in
all the way to the tube stop.
Green Tube
Adapt-a-Valve
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 27 28

Comments to this Manuals

No comments